Risk assessment

<< Click to Display Table of Contents >>

Navigation:  General Implementation Instructions > Tasks >

Risk assessment

 

The documentation of the risk assessment must be handed over to the client during basic engineering. The client would like to know already when placing the order which protection level is planned since the operating modes should already be determined at this time.

If access to the danger zones is required during operation, the protective devices and the signal processing equipment must correspond to at least performance level PL = d/category 3 (EN13675-A.2).